English: Tunnel boring machine Ada, about to be deployed at the Royal Oak Crossrail portal, on a low loader west of the foot bridge to the west of the portal. Before it can be moved any further the bridge must be raised 10ft on hydraulic jacks. This image was assembled from several pictures to create a panoramic view using the Hugin panoramic stitcher program.